Description
Features:
- 110x300mm x 1¼”/1½” (32mm) pipe top and side inlet connections.
- For use with limestone chippings.
- Receives discharge from a condensing boiler.
- For external use only.
- 19/23mm x 32mm solvent weld fitting provided to increase size of discharge pipe before it passes through external wall.
Installation Guidelines on Condensate Discharge:
- The condensate from the boiler should, where possible, be discharged into the internal drainage of the household drainage system.
- Internal condensate discharge pipework must be a minimum diameter of 19mm (which is generally viewed as 22mm OD) and must be of corrosion-free plastic pipe.
- The discharge pipework must ’fall’ at least 45mm per metre away from the boiler and take the shortest possible route to the discharge point or waste system.
- It is recommended if the condensate pipework has to be taken externally to the termination pipe, the pipework should be no less than 32mm in diameter – The external pipework should be as short in length as possible and should be protected with waterproof lagging from extreme weather conditions.
- Where the boiler already has an internal trap, no other trap should be installed as this will cause the boiler trap to malfunction.
- Waste pipe fittings should be kept to a minimum as the discharge flow should be as free as possible.
- If the discharge pipe is terminated into a gully, the pipe should be cut below the grating cover and above the water level – The pipe end entering the gully should be cut at 45°.
External Installation to a Soakaway:
- When installing a soakaway the ground conditions must be taken into consideration – It is recommended that the soakaway is not installed near any service pipework such as water or electrical mains cables and the installation of the soakaway should be a minimum of 500mm away from the building.
- The McAlpine soakaway should be installed in a hole depth of approximately 400mm minimum x 200mm in diameter.
- The soakaway should then be placed in the hole with the cut holes in the soakaway facing away from the foundations of the building.
- The soakaway should then be filled with 10mm limestone chippings.
Soakaway Installation:
- The condensate pipework may terminate above or below ground level – If above ground the condensate pipe must be protected with a waterproof lagging.
- The pipe end entering the soakaway must be at a depth of 25mm minimum and the end of the pipe cut at 45°.
- It is recommended that the soakaway is inspected during the annual service of the boiler.
Technical data:
- Conforms to – BS 6798:2009 and Building Regulations Approved Document H
- Brand – McAlpine
- Manufacturer CodeSOAK1GR
- Delivery OnlyNo
- BrandMcAlpine